Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Schluter Home Additions & ADU: The Summerlin Owner’s Guide
Adding a home addition or ADU to a Summerlin home typically runs $45,000 – $130,000 for an addition and $90,000 – $220,000 for a full ADU, and that range assumes a proper Schluter waterproofing system under every tile floor and shower pan. Schluter’s KERDI and DITRA lines are the materials beneath the finished surface, so owners usually discover a problem indirectly: a soft spot at a shower curb, grout that keeps cracking along a floor edge, or a musty smell in a new bathroom that never quite goes away. When that happens, the question isn’t the tile. It’s the membrane under it.

We’re Bradford Remodeling Co Summerlin, an independent remodeling contractor. We’re not affiliated with Schluter, and we don’t stock or carry parts on a truck. What we do is specify the right Schluter system for Summerlin additions and ADUs, source the correct components, and install them by the manufacturer’s spec, with a written price before any work starts.
Key Takeaways
- Addition range for Summerlin: $45,000 – $130,000. Detached or attached ADU: $90,000 – $220,000.
- Schluter systems (KERDI, DITRA, KERDI-BOARD) are the waterproofing and uncoupling layer, not the tile itself.
- Most “Schluter failures” are installation failures: wrong thinset, no movement joints, or a membrane bonded to a dirty substrate.
- Every completed project carries the 365-Day Done Right Promise, in writing, for a full year.
Which Schluter Models This Applies To

Schluter’s residential additions and ADU work usually touches four system families, and matching the right one is where most of the trouble starts.
- KERDI: the sheet waterproofing membrane for shower walls, pans, and wet-area floors. Comes in standard 5-meter and 30-meter rolls, in 1-meter width, with a fleece backing that has a specific orientation. The fleece side must face the thinset.
- KERDI-BOARD: the foam-backed tile backer panel. Thicknesses run from 1/8 inch up to 2 inches. The 2-inch panel is often used to build a shower bench or niche, not to level a floor.
- DITRA and DITRA-HEAT: the uncoupling membrane, and its heated-floor variant. DITRA has a specific stud height and cavity pattern; DITRA-HEAT has cable clips sized to a matching heating cable.
- KERDI-LINE and KERDI-DRAIN: linear and point drains with integrated bonding flanges. The flange size has to match the drain body, and the body has to match the rough-in depth.
How to identify the right part: read the printed stamp on the membrane edge or panel face. Schluter prints the product name and roll or panel identification directly on the material. If the stamp is gone, measure the thickness with a caliper. A 1/8-inch KERDI-BOARD is not the same as a 3/16-inch panel, and substituting one for the other changes your finish heights. Match the printed name, not what a box or photo suggests.
OEM vs. aftermarket: for Schluter specifically, use the OEM system. The fleece, the thinset compatibility, and the drain flange dimensions are engineered as a unit. A generic uncoupling membrane from a big-box shelf will not marry to a KERDI-DRAIN flange, and mixing a third-party drain with a Schluter pan voids the system’s warranty. A quality aftermarket movement joint or thin-set that meets ANSI A118.4 is fine. The core waterproofing layer should be Schluter.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Schluter Home Additions & ADU Is Failing
- Grout cracks along a floor perimeter or doorway. The uncoupling membrane is either missing at the transition or was installed over a substrate that moved. In Summerlin additions, the culprit is often the slab-to-framed-floor joint, where differential movement shows up first.
- A soft or spongy spot at a shower curb or bench. Water has gotten behind the membrane. Either the KERDI seam wasn’t overlapped and banded, or the panel was fastened through the waterproofing.
- Musty smell in a new bathroom that returns after cleaning. Moisture is trapped under the tile, usually because the KERDI-DRAIN flange wasn’t bonded to the membrane with the right thinset.
- Loose tile or hollow-sounding floor tiles. The membrane was bonded with the wrong thinset (modified over a Schluter fleece is correct in most cases; unmodified is often not), or the substrate wasn’t clean when it went down.
- Heated floor that reads cold in one zone. A DITRA-HEAT cable was nicked during tile setting, or the thermostat sensor was installed in the wrong location.
All five point to installation, not the Schluter material itself. That distinction matters when you’re deciding what to replace.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s the honest number for Summerlin. Replacing a failed Schluter waterproofing system under a shower runs $4,500 – $12,000 for a walk-in shower, which is our standard walk-in shower installation range. A tub-to-shower conversion runs $3,500 – $10,000. A full floor replacement with DITRA-HEAT over a failed membrane typically adds 20 – 30 percent to a standard floor install.
A home addition’s cost isn’t driven by the membrane alone, which is why the addition range is $45,000 – $130,000. Within that, the Schluter system on a full addition (one bathroom, one wet bar, one laundry) is a meaningful line item, and it’s where corners get cut on a low bid.
What drives the range: number of wet areas, whether the substrate needs repair first, linear vs. point drain, and heated floor or not.
- Written line-item quote before work starts. No numbers that move at the door.
- Schluter system components sourced to spec, with manufacturer documentation.
- 365-Day Done Right Promise: if the work fails inside a full year, we return and correct it at no charge.
DIY or Call Us?
Some checks are safe to do yourself. Press on the shower curb and bench to feel for soft spots. Look at the caulk line where the floor meets the wall for cracks. Feel for cold zones on a heated floor. Take a photo of the Schluter stamp on the membrane edge if you can reach it.
Where DIY goes wrong: replacing the membrane itself. The KERDI-DRAIN flange has to bond to the membrane with a specific thinset at a specific thickness, and the seam banding has to overlap a printed minimum. Miss the overlap by half an inch and water tracks behind the tile for years before you see it. On a 2019 addition off Summerlin Parkway, we tore out a shower that had been re-membraned by the homeowner, and the leak had been running into the framed wall for 14 months. The Schluter part wasn’t the failure. The install was.
If a shower pan or wet-area floor has failed, that’s a tear-out, not a patch. Call (844) 588-0072 for a free estimate. We answer with a live person, 24/7.
FAQs

Installed to spec, a Schluter KERDI or DITRA system has a service life measured in decades, well past 30 years in most residential applications. Summerlin’s dry climate helps the membrane itself. What shortens lifespan is the installation: a seam that wasn’t banded, a drain flange bonded with the wrong thinset, or fasteners driven through the waterproofing to hang a shower niche. That’s why the 365-Day Done Right Promise matters here. If the work fails within a full year, we come back and fix it at no charge. Call (844) 588-0072 for a free estimate.
Sometimes, but only on a localized failure. A single loose tile at a floor perimeter where the uncoupling membrane was never carried across the transition can usually be reset with a proper movement joint. A failed shower pan or a wet-area floor with a musty smell is a tear-out. Water has already migrated, and a patch on top of a compromised membrane traps moisture instead of fixing it. Call (844) 588-0072 and we’ll tell you which one you’re looking at, free.
A shower pan and membrane replacement typically runs 3 to 6 working days in a Summerlin home, including demo, substrate repair, membrane, tile, and cure time before the shower is usable. A floor replacement with DITRA-HEAT adds 2 to 3 days for the heating cable, thermostat, and thinset cure. A full addition with multiple wet areas is scheduled as part of the project timeline, which you’ll get in writing before we start. Call (844) 588-0072 to schedule your free estimate.
We order Schluter system components to your specific project spec. We don’t stock parts and don’t carry them on a truck, because the right membrane, drain flange, and panel thickness depend on your addition’s rough-in and finish heights. Before any work starts, you get the part list and the written price. The materials are sourced to Schluter’s published spec, with manufacturer documentation, so the warranty holds. Call (844) 588-0072 for a free estimate.
Whether the project is a Schluter-clad bathroom inside a Summerlin addition or a full ADU build, you get a written price before any tool comes out, a clean site at close, and a signed guarantee in your hand. We also work with KraftMaid, Cambria, and Silestone on the cabinetry and surface side of the same projects. Call (844) 588-0072 to schedule your free estimate.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.