







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Quikrete Home Additions & ADU: The Summerlin Owner’s Guide
If you’re building a home addition or accessory dwelling unit (ADU) on a Quikrete-based foundation and slab system, we handle the construction and keep the Quikrete-ready substrate and mix work moving with it. Installed additions in Summerlin run $45,000 – $130,000, and detached ADUs run $90,000 – $220,000, priced in writing before any work starts. We schedule multi-week builds, not same-day work, and you get the written price up front so nothing moves at the door.

Owners usually find a problem at the pour-and-frame stage. The slab hairline-cracks along the rebar line, the cold joint between the footing and slab opens, or the surface starts dusting a few months after the addition is framed. In Summerlin, those show up fastest on west-facing slabs where the afternoon sun sits on the concrete for eight hours and the overnight desert swing works the surface. That pattern is a Quikrete and mix-placement issue as much as a concrete one, and it tells you early whether the rest of the build will hold.
Which Quikrete Models This Applies To

Quikrete’s concrete and mortar lines are sold by mix type, not by model number the way an appliance is. The ones that come up in addition and ADU work are Fast-Setting Concrete Mix (the 50 lb bag most often used around post bases and small footings), High-Strength Concrete Mix (the 80 lb bag used on larger pours), Concrete Resurfacer for topping a spalled slab, and the sand and mortar mixes that sit under tile and block. Match the mix to the job, not the shelf. An 80 lb high-strength bag placed too dry in Summerlin’s low humidity cures weak; a Fast-Setting bag used on a wide thin pour sets before you can float it.
Identify what you have by the printed mix name and bag size on the label, and confirm the cure and strength class against the pour spec. The OEM-versus-aftermarket decision matters here: Quikrete’s own mixes are the reference standard, and a generic equal may meet the same PSI (pounds per square inch) spec while behaving differently in placement. For visible finish work, stay with the specified brand so the surface reads the same when it’s done. Bradford Remodeling Co Summerlin is an independent service provider and is not affiliated with Quikrete. We also work with documented brands like KraftMaid, Cambria, and Silestone on the interior side of an addition.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Quikrete Home Additions & ADU Is Failing
- Hairline cracks along the rebar line within the first year. The slab is curing unevenly, often from placement in summer heat without enough moisture held in.
- Surface dusting or a chalky finish that rubs off. An overwatered mix leaves a weak top layer that never hardens the way the spec calls for.
- Cold joint between footing and slab opening up. The two pours cured at different rates, and in Summerlin that shows fast on a slab poured across a hot afternoon.
- Spalling or flaking at the slab edges and thresholds. Repeated thermal swing plus moisture at the edge breaks down the surface. The fix is a resurfacer over a sound base, not a new pour.
- Framed walls moving or doors sticking in a new addition. That usually traces to an unsettled slab or a footing that didn’t reach bearing, and it needs a structural look, not a cosmetic patch.
Replacement Cost & What’s Included
A home addition in Summerlin runs $45,000 – $130,000 installed. Detached ADU construction runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. Those numbers cover the slab and mix work, framing, finishes, and the trades that tie into the main house, with the concrete-and-Quikrete scope broken out as a line item. What moves the range: footprint and square footage, whether the slab is a simple pour or needs grading and stem-wall footings, finish level, and permit review and inspections. Everything is quoted as a written line-item price before work starts, and the finished work carries the 365-Day Done Right Promise: if it fails inside that year, we return and correct it at no charge.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Checking the slab is safe to do yourself: look for cracks wider than a credit card’s edge, tap the surface for hollow spots, and note whether doors in the addition still swing clean. Mixing and placing concrete is where DIY goes wrong. A small bag of Fast-Setting Concrete is heavy and sets in minutes, and working it into a footing or a wide pour without the right tools and timing leaves a weak joint that shows up months later. Structural and finish work belongs with a crew that does it by the book. Call (844) 588-0072 for a free estimate and a written price before anything gets built. A live person answers, day or night.
FAQs

Plan on a multi-week build, not a same-day job. The slab typically needs several days to cure before framing starts, and total build time for a Summerlin addition runs from a few weeks to a couple of months depending on size, finishes, and inspection scheduling. Call (844) 588-0072 for a timeline based on your footprint; estimates are free.
Often yes. Hairline cracks, dusting, and spalling on a sound base can take a resurfacer or a bonded topping rather than a new pour. Cracks that run deep, a footing that didn’t reach bearing, or slab movement under a framed wall point to replacement or underpinning. Call (844) 588-0072 to schedule a free look at which one you’re facing.
We match the mix and bag size to the pour spec and the manufacturer’s stated cure and strength class, and pull the material through documented suppliers so the spec is traceable. Nothing sits on a truck waiting; the material is ordered to the job. Call (844) 588-0072 and we’ll walk through the spec with you.
No. Every addition gets a written price before any work starts, and that number holds unless you approve a written change. If something unexpected turns up in the slab or footing, we put the change in writing first. Call (844) 588-0072 for your free estimate.
Squared Away, Coming or Going
An addition that holds up starts at the slab and stays disciplined to the last walkthrough. Bradford Remodeling Co Summerlin runs on The Garrison Standard: a written price before work begins, background-checked and uniformed technicians on every job, calls answered by a live person, and the 365-Day Done Right Promise in your hand at close, with the site cleaned and the scope documented. When you’re finished, you have a signed written guarantee and no surprises. Call (844) 588-0072 for a free estimate on your Summerlin home addition or ADU, and we’ll put the price in writing before a single tool comes out.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.












