KraftMaid Home Additions & ADU: The Summerlin Owner’s Guide
A KraftMaid home addition or ADU build in Summerlin typically runs $45,000 – $130,000 for an addition and $90,000 – $220,000 for a detached or attached ADU, quoted in writing before any work starts. On this page we’re applying a parts-and-failure lens to something that’s actually a construction decision: a failing KraftMaid-supported addition or ADU usually doesn’t “fail a part,” it fails at the joint where the addition meets the original KraftMaid kitchen, bath, or built-in cabinetry line. On a Summerlin addition or ADU, you’ll often find warped door stiles, mismatched toe-kick heights, and cabinets that were fine before the addition but now show the settling. Below is what we check first.

Which KraftMaid Models This Applies To

KraftMaid builds distinct cabinetry series (Cambridge, Marquee, Rushmore, Echelon and others), and the compatibility problem with any addition is rarely the series itself. It’s the fact that a new room addition or ADU creates a different moisture and movement environment than the original KraftMaid installation was built for. If a Summerlin homeowner is trying to match existing KraftMaid cabinetry into a new addition, the serial and door-style info is on the label inside the cabinet door or on the drawer box; that label is what any reputable professional uses to source a compatible piece.
OEM vs aftermarket matters here, but not the way it does for a drawer glide. For KraftMaid cabinetry being tied into an addition, the honest answer is: match the original KraftMaid door style and finish where it’s still available, and accept that a ten-year-old finish under Summerlin’s UV load will not match a new cabinet exactly. Matching a KraftMaid box into a new wall cavity is a fit-and-trim job, not a swap. If the part is a hardware component (hinge, drawer glide, lift-up), a quality aftermarket equivalent will physically fit a KraftMaid box but the soft-close behavior and load rating can differ; we describe the trade-off before any work. Bradford Remodeling Co Summerlin is an independent service provider and is not affiliated with KraftMaid.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Home Additions & ADU Is Failing
- Cabinet doors binding after the addition was completed. This is the most common call we get in Summerlin. The cause is usually differential settling between the new footing and the original slab, not a bad cabinet hinge. The cabinet is the messenger.
- Mismatched toe-kick and reveal heights at the junction to the original room. Caused by the addition’s floor height being set to a slightly different datum than the original KraftMaid install. A 1/4-inch difference is normal and fixable; anything over shows.
- Sun-facing KraftMaid cabinet finishes fading faster than the rest of the house. Summerlin’s summer UV is severe on any east- or south-facing wall. UV-faded KraftMaid finish will not match a new addition’s cabinetry, and the fix is a finish match or a full-line refresh, not a spot patch.
- Warped or swollen KraftMaid panel doors near a newly added bath or kitchen wall. Almost always a moisture or vapor-barrier issue at the new wall, not a defective cabinet. KraftMaid builds a solid product; a failing door usually points at the wall behind it.
- An ADU walkthrough where a KraftMaid vanity or cabinet pulls away from the wall. This points at framing attachment, not the cabinet. An ADU built to plan should not have cabinets moving at year two.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Summerlin, the honest installed ranges are: home addition $45,000 – $130,000; ADU construction $90,000 – $220,000; garage conversion $30,000 – $80,000. Within that, a KraftMaid-compatible cabinetry scope runs alongside the build, and a standalone cabinet installation in an addition is $4,000 – $13,000 depending on the run length and door style. Countertop work where a new addition or ADU includes one is $2,000 – $6,500; a backsplash is $800 – $2,500; a kitchen island in a Summerlin ADU is $3,000 – $10,000.
The range is driven by foundation and slab work, roof tie-in, MEP rough-in, and finish matching against the original KraftMaid line. Every price is written before work starts, line by line, and does not move mid-job. All completed work is covered by the 365-Day Done Right Promise: if the work fails inside that year, Bradford returns and corrects it at no charge.
DIY or Call Us?
An owner can safely check a few things: open every KraftMaid cabinet door in the affected room and note where the door binds or rubs, check whether the cabinet toe-kick lines up with the original room’s floor, and photograph any gap between cabinet back and wall. Those notes are useful. What we don’t recommend is adjusting the addition-to-original seam or trying to re-anchor cabinets that have pulled, because that work touches framing, moisture barrier, and sometimes the structural tie-in, and getting it wrong makes the problem worse and more expensive. A 1/4-inch settlement after a Summerlin addition is not unusual; a 3/4-inch movement is a call. Call (844) 588-0072 for a free estimate and a written scope before any work.
FAQs

KraftMaid cabinetry should hold up well past a decade when the room behind it is built correctly, and the realistic failure timeline in Summerlin is almost always the wall or footing, not the cabinet. When a cabinet starts misbehaving inside a new addition within a few years, we treat it as a construction problem first. Call (844) 588-0072 for a free estimate so we can look at all of it together.
Often yes, and we say so when it’s true. A KraftMaid door that binds after an addition can frequently be re-hung and the reveal corrected; a cabinet that has pulled from the wall can usually be re-anchored if the framing is sound. What can’t be repaired cheaply is a foundation or tie-in issue that is ongoing, and any honest estimate will flag that before you sign. Call (844) 588-0072 for a written line-item quote.
A home addition in Summerlin typically runs several months depending on size and inspection scheduling, and an ADU runs longer. We don’t promise same-day on planned construction, and we don’t need to. You get a written schedule with the written price, KraftMaid-compatible cabinetry included where it’s in scope, and the 365-Day Done Right Promise once it’s done. Call (844) 588-0072 for a free estimate.
We work from the label inside your existing KraftMaid cabinet door and from published KraftMaid specs, so the door style and box dimensions match. Where a finish can’t match due to age and Summerlin sun, we tell you that plainly before you commit. Other brands we work with across the same projects include Cambria, Silestone, and Kohler. Call (844) 588-0072 for a free estimate.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.