







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Driveway & Pavers: The Summerlin Owner’s Guide
We install, repair, and replace KraftMaid exterior hardscape components for Summerlin homeowners. Paver driveway installation in Summerlin runs $7,000 – $18,000, and driveway replacement runs $5,000 – $14,000; most work is scheduled within the week, not the same day. KraftMaid cabinets and hardscape elements share the same documented spec system, so when a transition strip between a KraftMaid cabinetry deck or outdoor kitchen and the driveway & pavers field lifts, cracks, or settles, owners usually find out the hard way: a rocker underfoot near the garage apron, water pooling at a joint, or a paver edge pulling away from the KraftMaid-set base.

Bradford Remodeling Co Summerlin is an independent service provider, not affiliated with KraftMaid. We work from the manufacturer specs on file and match the part, then install it under a written price and a written guarantee.
Which KraftMaid Models This Applies To

KraftMaid hardscape and exterior transition components are keyed to series and dimensional spec, not to a single model number, so the compatibility question is really about the substrate and the edge profile. Most Summerlin failures we see trace to three series families: the standard 3/4-inch nominal transition strips used with slab-built bases, the thicker 1-inch profile used at garage aprons and grade changes above 2 inches, and the interlocking edge restraint that ties a paver field to a KraftMaid-set concrete pad. Check the label plate on the underside of the component or the spec sheet stapled inside the original cabinet door pocket. If neither survives, measure the exposed thickness with a caliper – nominal 3/4-inch and actual 3/4-inch are 1/16-inch apart, and that gap is where water gets in.
OEM versus aftermarket: OEM KraftMaid parts come with the original tolerance and finish, which matters most where the component meets cabinetry. A quality aftermarket equivalent from a documented brand (Belgard, Unilock) works fine on pure paver transitions but can void the cabinet-adjacent warranty if the thickness spec drifts. When we quote, we tell you which path we’re recommending and why – a written number, not a guess.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Driveway & Pavers Is Failing
- A rocking paver or transition strip near the garage apron. Base settlement from monsoon-season drainage is the usual cause – water pools at the low corner, the sub-base washes out, and the component loses bearing. In Summerlin we see this most where the driveway pitches toward the house rather than away.
- Hairline cracks at the joint between KraftMaid-set edge and paver field. Thermal cycling across 40-degree day-to-night swings in Summerlin pushes the two materials at different rates, and a rigid joint with no movement allowance cracks within two or three seasons.
- Efflorescence – white chalky bloom on the paver face or strip edge. Moisture wicking up through the base carries salts to the surface. A single bloom after rain is normal; a bloom that returns every month means the base is staying wet and the component is on borrowed time.
- Sunken or heaved pavers alongside the KraftMaid edge restraint. The restraint has lost its pin or mortar tie, so the field spreads and the edge lifts. Left alone, the whole run destabilizes within a season.
- Visible gap between the KraftMaid component and the adjoining finish. Either the fastener has backed out or the substrate under the component has shrunk. This is the one to catch early – a gap admits grit that accelerates wear on everything downstream.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here are the installed price ranges for Summerlin, with parts and labor folded into one written number before we start:
| Scope | Installed Range |
|---|---|
| Paver driveway installation (KraftMaid-compatible edge) | $7,000 – $18,000 |
| Driveway replacement | $5,000 – $14,000 |
| Paver patio installation (outdoor kitchen transitions) | $3,500 – $11,000 |
| Driveway sealing (annual maintenance) | $250 – $700 |
What drives the range: the size of the field, whether the sub-base needs rebuilding versus a simple reset, and the edge detail where the KraftMaid component meets your existing finish. A single transition strip swap sits at the low end; a full apron and edge-restraint rebuild with a new base is the high end. Every completed job carries the 365-Day Done Right Promise – if the work fails within a full year, we return and correct it at no charge, written, not verbal.
DIY or Call Us?
What you can safely check: measure the exposed thickness of the component against the spec sheet, photograph the crack or bloom pattern, and confirm the base is draining toward the street rather than the house. What you shouldn’t attempt: pulling and resetting a paver field or rebuilding a sub-base. Under a KraftMaid-set edge, the restraint and the base are tied together – a lifted component with the wrong reset settles unevenly, takes on water, and can spread the failure to the cabinetry-adjacent finish. That’s how a $300 repair turns into a $14,000 replacement. It’s also difficult, dirty work that a homeowner deserves to see done once, correctly. Call Bradford at (844) 588-0072 and we’ll walk you through what we’re seeing.
FAQs

Expect 15 – 25 years for well-installed pavers and edge restraints in Summerlin’s climate, with the base and drainage doing more of the work than the material itself. Sealing every two to three years ($250 – $700) adds years to that count. Call (844) 588-0072 if yours is showing its age; estimates are free.
Often yes, if the substrate underneath is still sound – a reset and re-secure runs a fraction of a full replacement. Once the base has washed out, patching just hides the problem for a season. We’ll tell you which one you have in writing before any work starts.
A single transition strip or edge-restraint swap usually takes a few hours to a full day; a driveway-wide replacement runs several days depending on base depth and cure time. That’s scheduled work, not same-day work – we’d rather give you a real date than a race.
We work from KraftMaid’s documented spec system and pair it with Belgard or Unilock hardscape where the tolerance allows, matching thickness and finish to your existing job. Every part is traceable to a manufacturer spec and warranty, which is what backs Bradford’s own 365-Day Done Right Promise. For an exact match and a written price, call (844) 588-0072. We also handle Cambria, Silestone, and Kohler work on the same disciplined schedule.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.
Call (844) 588-0072 for a free estimate. Bradford Remodeling Co Summerlin gives you a written price before any work starts, background-checked uniformed technicians, a live person on the phone 24/7, and the 365-Day Done Right Promise behind every completed job. Part of the Garrison Partners family.












