







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Summerlin Owner’s Guide
We build CGI-compatible home additions and ADUs for Summerlin homeowners, with typical installed pricing from $45,000 to $130,000 depending on scope and square footage. Standard additions run toward the lower half of that band; attached ADUs with full kitchens and baths sit at the top. As an independent contractor, Bradford Remodeling Co Summerlin isn’t affiliated with CGI, so we work to the spec sheet rather than to a dealer’s menu. Owners usually discover a failing build-out the same way: a crack that keeps returning at a door jamb, a ceiling seam that sags each summer, or a room that never holds temperature no matter what the thermostat says.

Which CGI Models This Applies To
CGI’s addition and ADU packages cover a catalog of panelized modular and site-built systems, and the exact spec follows the series and lot number on the plan sheet. Before we quote, we pull the model number and the plan set, then measure the existing footprint at the wall line. That’s the check that catches the most common compatibility gap: a panel system engineered for a full slab won’t sit correctly on a stem-wall foundation, and a Summerlin lot with a raised pad needs a different anchor and sill detail than the same package on grade. If you’re matching finishes, CGI’s spec book is usually interchangeable with KraftMaid and Cambria lines, which matters when you want the addition’s cabinetry and counters to read as one house rather than two.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
Most of these show up in the third or fourth summer, not the first. That’s the timeline for desert heat cycling to surface what a build-out got wrong at framing and flashing.
- Recurring hairline cracks at door and window corners. Differential movement between the addition and the main house, usually a foundation or header detail that wasn’t engineered for Summerlin’s expansive soils.
- Ceiling seams that open each summer. A drywall joint over a truss or panel edge where the connection wasn’t screwed and taped correctly, so it works with the thermal swing.
- Rooms that won’t hold temperature. Missing insulation at the transition wall or an unsealed rough-in, letting attic heat pull through the addition.
- Water staining at the roofline tie-in. Flashing between the addition roof and main roof is the single most common failure point on any build-out.
- Doors that stick in July and free in October. Moisture and thermal movement at the sill plate, often a sign the subfloor wasn’t protected during construction.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For Summerlin, home additions run $45,000 to $130,000 installed, and attached ADU construction runs $90,000 to $220,000. Garage conversions land between $30,000 and $80,000 and are often the cleanest path if you already have a slab and roof. The range is driven by square footage, foundation type, how far we’re running plumbing and electrical, and finish level. Every quote is a written price before any work starts, itemized by scope, so nothing moves at the door. All completed work carries the 365-Day Done Right Promise: if it fails inside a full year, we return and correct it at no charge.
DIY or Call Us?
You can safely check a few things yourself: photograph the cracks, note where ceiling seams open, test doors for seasonal binding, and look for staining at the roof tie-in. What you shouldn’t attempt is opening the framing, reflashing a roof junction, or cutting into the transition wall. Those involve load paths, water intrusion, and utility rough-ins, and a wrong move there is expensive to undo. Summeerlin’s wind-driven monsoon rain finds every gap you leave. Call us at (844) 588-0072 for a free estimate and we’ll give you a written number before anything is touched.

FAQs

How long should a CGI home addition last in Summerlin? A correctly built addition should hold its envelope for 30 years or more; the failures we see are almost always at the roof and foundation tie-ins rather than the structure itself.
Can a failing addition be repaired instead of rebuilt? Often yes, particularly when the problem is flashing, a drywall seam, or insulation. We inspect first, then give you a written scope. If a repair is the honest answer, that’s what we quote. Call (844) 588-0072 for the assessment.
How long does the build take? A garage conversion runs six to ten weeks; a full addition or ADU runs three to six months depending on permits and finishes. Schedule depends on scope, and we set it in writing before we start.
How do you source materials for a CGI-compatible build? We work from the plan set and spec sheet and source through a documented roster of brand-name manufacturers so every component is traceable. Call (844) 588-0072 and we’ll walk through the spec with you.
CGI-compatible additions and ADUs are the kind of build where the details at the roof tie-in and foundation decide whether the room holds up. Give us a call at (844) 588-0072 for a free estimate, a written price, and the 365-Day Done Right Promise behind the work.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.












