







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cambridge Pavers Home Additions & ADU: The Summerlin Owner’s Guide
We build Cambridge Pavers-compatible home additions and ADUs in Summerlin, and most projects land between $45,000 and $130,000 for an addition, with standalone ADU construction running $90,000 to $220,000 and garage conversions $30,000 to $80,000. Every project gets a written price before work begins and carries the 365-Day Done Right Promise. Summerlin owners usually start asking about this when a planned addition has outgrown the drawings the builder handed over, when an ADU concrete pad has settled against Cambridge pavers, or when a garage conversion plan runs into HOA and Clark County review at the same time.

Bradford Remodeling Co Summerlin is an independent remodeling contractor. We’re not affiliated with Cambridge Pavers, and we don’t sell their products. What we do is build additions, ADUs and conversions to the specifications Cambridge Pavers publishes, so the hardscape and structural work on your Summerlin property holds together for the long run.
Key Takeaways
- Addition pricing in Summerlin: $45,000 – $130,000 for most single-story or second-story additions.
- ADU construction: $90,000 – $220,000. Garage conversion: $30,000 – $80,000.
- Written price before work starts, every time, no numbers that move at the door.
- Every completed project covered by the 365-Day Done Right Promise.
- Live person answers the phone 24/7 at (844) 588-0072.
Which Cambridge Pavers Models This Applies To

Cambridge Pavers makes a documented line of paver and hardscape products, and the part most Summerlin owners actually need matched isn’t a spring or a hinge – it’s the specification that ties your addition’s foundation, walkways and patio surround to the paving system already installed. The series matters. Cambridge’s structural-grade pavers, including the thicker profiles used in driveway and foundation-adjacent applications, are not the same product as the thin wall veneer used on planter walls and decorative corners. Mixing them in a Summerlin addition means the substrate under your new covered patio and the substrate under your existing walkway won’t settle at the same rate, and you’ll see it as a lip or a trip step within a few summer monsoon cycles.
To identify what you have: check the binder the builder or previous owner left, look for the Cambridge Pavers imprint on the underside or edge of an existing paver, and measure the thickness. Three inches and up usually means a structural grade. An inch and a half or less means a landscape or veneer product.
The OEM-versus-aftermarket call is straightforward here. Cambridge makes the actual pavers; nobody makes a substitute Cambridge paver. What you’re deciding is whether the addition’s hardscape spec matches the installed Cambridge product or gets swapped to a different manufacturer at the transition line. We don’t carry pavers on a truck and we don’t stock Cambridge parts locally. We work from your documented spec and source what the job needs, so the match is measured rather than guessed. Similar brand-matching logic applies when we handle KraftMaid, Cambria or Silestone inside the addition.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Cambridge Pavers Home Additions & ADU Is Failing
Most failures here aren’t a paver cracking. They’re a connection failing between the addition and the paving system, or a conversion that was built to a spec that doesn’t match the surrounding work. These five symptoms show up regularly in Summerlin:
- Lipped or rocking pavers at the door threshold. The base course under the transition from your new addition slab to the existing Cambridge walkway has settled or wasn’t compacted to spec. It’s a base problem, not a paver problem, and re-leveling the paver without fixing the base just buys you a season.
- Water pooling against the addition wall after monsoon storms. The drainage slope on the paver field was set too flat, or the addition’s grade change redirected runoff against the wall. Summerlin’s clay-heavy soils and summer storm volume expose this faster than any other climate signal.
- Cracks in the garage conversion slab or paver apron. Usually a curing issue or an under-slab utility conflict that wasn’t caught in the plan review. Clark County’s permitting process will flag it at inspection, and it’s expensive to correct after the pour.
- Efflorescence – the white chalky bloom on Cambridge pavers. In Summerlin’s dry heat and irrigation overspray, efflorescence is common and usually cosmetic. If it returns within weeks of being cleaned, the moisture source is the real issue and the paver is telling you so.
- ADU foundation heave or door misalignment. Expansive soil under an improperly prepped foundation shows up as sticking doors and cracks in the first year. It’s the most expensive symptom on this list and the one most worth catching early.
Replacement Cost & What’s Included

Here’s what the real numbers look like in Summerlin, installed:
- Home addition: $45,000 – $130,000. A single-story bump-out or a modest second-story addition sits in the lower half; a full master suite or a family room with structural work lands near the top.
- ADU construction: $90,000 – $220,000. Detached ADUs with a kitchen, full bath and separate utilities run near the top of that range.
- Garage conversion: $30,000 – $80,000. Depends on whether you’re adding a bath, moving or adding utilities, and whether the existing slab passes inspection.
What moves the range: structural scope, utility relocations, permitting depth with Clark County and your Summerlin HOA, and the hardscape tie-in to your existing Cambridge pavers. What’s included in every written price: the line-item scope, permits and inspection coordination, materials traced to the manufacturer spec, and cleanup at close. The 365-Day Done Right Promise covers the finished work for a full year. If something we installed fails inside that window, we come back and correct it at no charge.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Some things you can safely check. Others you shouldn’t touch. Home addition and ADU work involves structural loading, electrical rough-in, gas connections and foundation work. None of that is a DIY category, and we say so plainly. If you’re replacing a single paver, cleaning efflorescence off a Cambridge walkway, or re-sealing a patio, you can do that yourself with the right product.
Where DIY goes wrong for Summerlin owners is smaller in appearance and bigger in cost. Re-leveling a lipped paver without addressing the base course, patching a slab crack before you know what caused it, or converting a garage without pulling a permit. The last one is the expensive one because Clark County will catch it at resale, and the unpermitted work becomes your cost to unwind.
If you’re not sure whether the symptom is cosmetic or structural, call (844) 588-0072. We’ll tell you straight. Estimates are free and a live person picks up.
FAQs

A properly built addition on a Cambridge paver hardscape typically holds 30 to 50 years with normal maintenance, and the pavers themselves can outlast the addition’s finishes. In Summerlin, the limiting factor is usually drainage and base compaction under the pavers, not the pavers. Irrigation overspray and monsoon runoff are the two fastest ways to shorten the life of that transition. Call (844) 588-0072 to get a specific read on your property.
Often it can be repaired. A lipped paver field, an efflorescence issue or a settled threshold is usually a base-course correction, not a,rebuild. Structural cracks in an ADU slab or heave in a conversion foundation are a different category and typically need a proper fix, not a patch. The honest answer depends on which symptom you have, and we won’t tell you it’s a rebuild if it isn’t. Call for a free estimate and we’ll tell you which one you’re looking at.
Garage conversions in Summerlin generally run six to ten weeks. Home additions run three to six months depending on scope and permitting. ADUs take the longest, often five to nine months, because of separate utility work and the Clark County review cycle. We give you the schedule in writing before work starts so there’s no guesswork. Call (844) 588-0072 for a project-specific timeline.
We work from your documented spec and the manufacturer’s published dimensions, not from a guess. We don’t stock Cambridge products locally and we don’t carry parts on a truck. We identify the series, confirm the thickness and structural grade, and source through the manufacturer’s distribution channel. That’s how the match stays traceable to Cambridge’s spec sheet. Call us to walk through what you have.
Get a Written Price Before Any Work Starts
Every Bradford Remodeling Co Summerlin project starts with a written price, whether it’s an addition, an ADU or a garage conversion in Summerlin. Background-checked, uniformed technicians on every job, so you know who’s walking through your door. Live person answers the phone 24/7. The Garrison Standard sits behind all of it, and the 365-Day Done Right Promise covers the finished work for a full year. Call (844) 588-0072 for a free estimate in Summerlin.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.












