5 Mistakes to Avoid With General Contractor
Four out of five remodeling disputes in Nevada trace back to a scope-of-work document that either didn’t exist or was written in language loose enough to mean anything. That’s not bad luck. That’s a missing checklist. The five most expensive general contractor mistakes Summerlin homeowners make have almost nothing to do with tile selection or budget math. They’re contract and process failures that happen before the first tool comes out, and every one of them is preventable if you know what a proper pre-construction document looks like.
Below is the preflight checklist we’d hand a neighbor. If you’d rather have a pro walk it with you, call (844) 588-0072.
Key Takeaways
- A contract that lists “kitchen remodel” as one line is not a scope of work; it’s an argument waiting to happen.
- Permits must be pulled before work starts, not “later.” Post-start permits create inspection gaps that cost real money.
- A deposit receipt is not a payment schedule. A legitimate draw schedule ties every payment to a completion milestone.
- Mechanics’ liens in Nevada can cloud your title even after you’ve paid the GC in full.
- Verbal change orders are the single most common source of five-figure overruns on Summerlin remodels.
Mistake #1: Signing a Contract Without a Line-Item Scope
“Kitchen remodel” as a single line on a contract is not a scope of work. It’s a headline. A real scope of work breaks the job into line items a stranger could read and price: demolition square footage, cabinet brand and model line (KraftMaid and Wellborn, for instance, are specified by door style and finish, not just “new cabinets”), countertop material and edge profile (Cambria and quartz surfaces carry per-square-foot numbers), plumbing rough-in locations, electrical circuit count, backsplash square footage, and finish schedules for paint and flooring. Every one of those lines gets a dollar figure.
When a Summerlin homeowner signs a one-line scope, the contractor isn’t being lazy. They’re leaving room. The cheaper the paperwork, the more the price can drift once the walls open up and the “unforeseen” list grows. We’ve seen contracts in Summerlin’s Red Rock Country Club area where the only written line was “full kitchen renovation – $62,000,” and the final invoice ran $40,000 over. That gap didn’t come from the work. It came from the absence of definitions.
What a proper line-item scope includes:
- Demolition and disposal – square footage, dumpster count, haul-away included or not.
- Rough-in work – plumbing and electrical line items with fixture counts and locations.
- Materials by brand and model – KraftMaid or Wellborn cabinetry, Cambria surface with edge profile named, fixture finish and SKU.
- Labor by trade – tile setter, cabinet installer, painter, each with an allowance.
- Exclusions – a written list of what’s not in the price. This is often more important than what’s in it.
If you’re evaluating a bid and can’t find the exclusions list, you haven’t found the answer yet.
Mistake #2: Letting a GC Pull Permits “Later”

Permits are a sequencing document, not a formality. In Summerlin, a kitchen or bathroom remodel that touches plumbing, electrical, or structural walls needs a permit before the first hammer swings, and the inspection schedule is built into the permit. Framing inspection happens before drywall closes the walls. Rough-in plumbing and electrical inspections happen before insulation. If a contractor starts the job and pulls the permit afterward, the inspections can’t sequence correctly. You get a rough-in inspection done after the wall is already closed, or a framing inspection skipped entirely.
The cost of that gap is not administrative. It’s structural. Unpermitted work in Summerlin can surface years later at resale, when a buyer’s inspector flags it, the appraiser discounts the property, and the title company wants a paper trail that doesn’t exist. We’ve seen Summerlin homes in The Ridges where a replaced load-bearing wall was finished without a structural inspection, and the correction meant opening the wall back up. That’s a $9,000 fix for what should have been a $400 permit.
What permit sequencing actually requires:
- Permit pulled and posted before demolition begins.
- Framing, electrical, and plumbing rough-in inspections sequenced before drywall.
- Final inspection scheduled and passed before the job is called done.
- Signed-off permit card delivered to the homeowner at close.
Ask for the permit number in writing before work starts. If the contractor hesitates, that’s your answer.
Mistake #3: Confusing a Deposit Receipt With a Payment Schedule
A deposit receipt shows you paid. A payment schedule shows what you’re paying for. Those are different documents, and confusing them is how Summerlin homeowners end up $30,000 into a job that’s 15 percent complete. A legitimate draw schedule ties every payment to a completion milestone: demo complete, rough-in inspected, drywall hung, cabinets set, countertops templated and installed, final walk-through. Each draw releases when the milestone is verified, not when the calendar says so.
The legitimate structure most contractors use is a modest deposit (often 10 to 15 percent of contract value, capped by state rules), a series of milestone draws across the project, and a final retention held until punch list completion. When a contractor asks for 50 percent up front on a Summerlin whole-home remodel, the question isn’t whether they need it. It’s what the money is secured against if the work stops.
What a proper draw schedule looks like:
- Deposit – 10 to 15 percent, tied to mobilization and materials ordering.
- Rough-in draw – released after rough-in inspections pass.
- Drywall and finishes draw – released after surfaces are closed and verified.
- Final draw and retention – held until the punch list is signed off and the written guarantee is in your hand.
Every number on the draw schedule should have a matching milestone. If it doesn’t, write one in before you sign.
Mistake #4: Skipping the Lien Waiver Step

Nevada mechanics’ lien law allows subcontractors and material suppliers who weren’t paid to file a lien against your property, even if you paid the general contractor in full. That’s the part most Summerlin homeowners don’t find out until a title search turns up a $14,000 lien from a cabinet installer the GC never paid. The GC did nothing wrong on your job. The lien is still on your title, and you can’t sell or refinance until it clears.
The fix is a document called a conditional lien waiver, and it’s collected at every draw. When you release a payment to the GC, the GC produces signed waivers from every subcontractor and material supplier who worked during that draw period, stating they’ve been paid and waive their lien rights for that work. At final payment, you collect unconditional waivers from all of them, releasing all lien rights on the project. That stack of paper is what protects your title.
What to verify at every draw:
- Signed waivers from every sub and supplier who worked during that period.
- Waiver amounts that match the draw amount.
- Unconditional final waivers from all parties at close of job.
- A written warranty and guarantee document signed and delivered with the final waivers.
This is the step we don’t skip. Bradford’s 365-Day Done Right Promise is backed by the same paperwork discipline: contractual, written, and filed with the close-out documents. When a Summerlin homeowner closes a job with us, they hold a clean title file and a written year-long guarantee.
Mistake #5: Accepting a Verbal Change Order
“Just add it to the total” is the most expensive sentence in remodeling. Verbal change orders are the single most common source of budget overruns on Nevada remodel projects, and the average undocumented scope change adds somewhere between $2,000 and $8,000 to a mid-size job. The reason isn’t that contractors are dishonest. It’s that memory is unreliable on both sides, and without a signed document there’s no way to resolve the disagreement later. What was “an extra $800 for the second vanity” during the walk-through becomes a $2,400 line item in the invoice, and neither party can prove what was agreed.
The fix is a written change order, signed before the change happens, with three pieces of information: what’s being added, the dollar amount, and the schedule impact. No signature, no work. No amount, no signature. It takes about ten minutes to write. It saves about ten thousand dollars of argument.
What a proper change order includes:
- Description of the change – specific scope, not “additional work.”
- Dollar amount – the line-item price, not a range.
- Schedule impact – days added or removed.
- Signed approval – both homeowner and contractor, dated.
The discipline cuts both ways. When a Summerlin homeowner asks us to move a wall mid-project, we write the change order before the saw comes out, and they know exactly what it will cost before they approve it. That’s The Garrison Standard in practice.
When to Call a Pro

Four of the five mistakes above are contract failures. The fifth, permit sequencing, is a code failure. Neither is something you want to learn during a project. If you’re in Summerlin and you’re staring at a bid you’re not sure how to read, or a scope of work that looks thin, that’s the moment to get a second set of eyes on the paperwork. Not the moment to sign.
For the services that hide the most paperwork, these pages cover what the pre-construction phase looks like in detail: General Contractor in Sandy Valley, Kitchen Remodeling in Sandy Valley, and Bathroom Remodeling in Sandy Valley. For an overview of how we run a job from signed scope to final guarantee, see our Bradford Remodeling Co Summerlin home page.
The Bottom Line
None of the five mistakes above come from picking the wrong tile. They come from what’s on paper before the job starts: the line-item scope, the permit sequencing, the draw schedule, the lien waivers, and the change order discipline. Get those five right, and the renovation itself goes the way a renovation should. Get them wrong, and no amount of tasteful finish work will fix the argument that follows.
In Summerlin, we’ve watched the same mistakes cost homeowners five figures in avoidable overruns. The Garrison Standard exists to make those mistakes impossible: every price in writing before a tool comes out, every guarantee in writing at close, every change order signed before the work moves. Our technicians have up to 22 years of experience, and the documentation discipline is a big reason why. If you’re in Summerlin and need help, Bradford Remodeling Co Summerlin offers free estimates – call (844) 588-0072 and a live person will answer, any hour.
Frequently Asked Questions
A line-item scope should break the job into priced components: demolition square footage, rough-in counts for plumbing and electrical, cabinetry specified by brand and model line, countertop material and edge profile, finish schedules, and a written exclusions list. Any scope that reads “kitchen remodel – $62,000” as a single line is not a scope. Call (844) 588-0072 if you want us to walk through a bid with you – estimates are free.
In Summerlin, the licensed contractor pulls the permit, and it gets pulled before demolition begins. The permit defines the inspection sequence: framing before drywall, rough-in plumbing and electrical before insulation, final inspection before close-out. A contractor who starts work first and pulls permits later can’t sequence inspections correctly, and the gap can cost thousands to correct. Ask for the permit number in writing before work starts.
A mechanics’ lien waiver is a signed document from a subcontractor or material supplier stating they’ve been paid for a specific draw and waive their lien rights for that work. In Nevada, unpaid subs and suppliers can file a lien against your property even if you paid the GC in full. Collecting conditional waivers at every draw and unconditional final waivers at close is what keeps your title clean. Call (844) 588-0072 to ask how we handle lien waivers on Summerlin jobs.
On a mid-size Summerlin remodel, an undocumented scope change typically adds $2,000 to $8,000 to the final invoice, sometimes more, because there’s no written record of what was agreed. The fix is a signed written change order with a description, dollar amount, schedule impact, and dated approval collected before the work happens. No signature, no work. Call (844) 588-0072 for a free estimate and a sample change-order form.
Written by the team at Bradford Remodeling Co Summerlin.