







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ES Windows Roofing: The Summerlin Owner’s Guide
Roofing components originally supplied or specified alongside ES Windows systems in Summerlin are replaced, not repaired, once the flashing, sealant beds, or roof-to-window transitions fail, and installed pricing in Summerlin runs $8,000 – $20,000 for a roof replacement tied to those details, or $400 – $1,800 for a focused repair. We install ES Windows-compatible roofing components and can usually get a repair assessment on the calendar within days, not weeks. Most Summerlin owners discover the failure the same way: a water stain spreading across a ceiling near a window head, caulk that keeps cracking no matter how often it’s redone, or granules collecting in the pool after the first big monsoon.

Which ES Windows Models This Applies To
ES Windows refers to a family of impact-rated and standard window and door systems common across Summerlin’s newer builds, and the roofing details that fail are usually the ones tied to how those units integrate with the roof plane: head flashing, sill pans, and the transition membrane where a window meets a tile or shingle field. Identification starts at the label. Look for the manufacturer’s rating plate on the window frame itself, usually a small etched or stickered mark on the jamb, then measure the rough opening for the window and the run of flashing above it. In Summerlin, where Spanish tile and low-slope profiles dominate, the compatibility gotcha is underlayment thickness and the metal profile gauge: thinner flashing that works on a shingle roof doesn’t hold up under tile load and heat cycling, and a mismatched profile will never seat cleanly. On the OEM-versus-aftermarket decision, ES Windows-specific trim and flashing pieces are worth sourcing OEM when the part is a direct interface component, while generic underlayment and sealants from name brands such as GAF or James Hardie often perform identically. For cabinetry, countertops, or surfaces damaged by a related leak, we also work with KraftMaid, Cambria, and Silestone.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your ES Windows Roofing Is Failing
- Water staining near a window head. The head flashing is lifting or the sealant bed has opened, letting water run behind the window instead of over it.
- Caulk that keeps cracking. Summerlin’s dry heat and daily temperature swings harden sealant quickly; if you’re recaulking every season, the underlying flashing profile is likely wrong.
- Granule loss at the roof-to-window transition. Missing granules mean the shingle or membrane is past its service life and the flashing above it is next.
- Daylight or draft around the window frame. Movement of the window unit or settling flashing has opened a gap that also lets heat and water in.
- Soft spots or lifted tiles near the window. The underlayment beneath has absorbed water and lost its bond, which is a flashing failure showing up from below.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Our Summerlin installed price ranges are $400 – $1,800 for a focused roof repair tied to a window or flashing detail, $8,000 – $20,000 for a full roof replacement, and $600 – $2,500 for tile roof repair. The range depends on roof size, material (tile, shingle, metal), and how many window transitions are involved; metal roofing runs $15,000 – $40,000 when the whole field is being replaced. We price parts and labor separately and tell you what each line is, before any work starts. Every completed job is covered by the 365-Day Done Right Promise: if the repair or install fails within a full year, we return and correct it at no charge. You get a written price before we pick up a tool, no exceptions, and no numbers that move at the door.
DIY or Call Us?
You can safely inspect, photograph, and document. Check the window label for the model, look for lifted or cracked flashing from the ground, and feel for draft or moisture at the window frame. What you shouldn’t do yourself is anything on the roof or at height: walking a tile roof can crack tiles and break through the underlayment, and removing or reseating flashing around a window head is where water intrusion starts, not where it ends. Slip and fall injuries on roof work are serious, and a resealed flashing that fails under the first summer monsoon costs far more to fix than it saved. Call us at (844) 588-0072 for a free estimate; a live person answers day or night.
FAQs

How long does ES Windows-compatible roofing last? In Summerlin, the window transition flashing and sealant typically last 10 to 15 years before heat and sun start degrading the sealant; the roof field itself may last 20 to 30 years depending on material and installation quality.
Can it be repaired instead of replaced? Yes, if the failure is localized to the flashing and the roof field is sound, a focused repair is often the right call and runs $400 – $1,800. A full replacement only makes sense when the underlayment or decking is compromised. Call (844) 588-0072 to find out which applies.
How long does the work take? A focused flashing or window transition repair is typically a one-day job; a full roof replacement runs two to five days depending on size and material. You get the schedule in writing before we start.
How do you source the part? We determine your ES Windows model from the label and specification, then source the compatible flashing, trim, or membrane piece through a documented material roster. Bradford Remodeling Co Summerlin is an independent service provider and is not affiliated with ES Windows.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.
Call (844) 588-0072 to schedule your free estimate. We’re part of the Garrison Partners family, independently owned and operated under The Garrison Standard, with background-checked, uniformed technicians on every job and a written price in your hand before any work begins.












