







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Bathroom Remodeling: The Summerlin Owner’s Guide
Bathroom remodeling in Summerlin with IKO-specification materials typically runs $9,000 to $28,000 installed, depending on square footage, fixture count, and whether the wet area gets a full rebuild. If you’re reading this because something in your bathroom has started to fail, you’re in the right place: the sections below cover what fails first, which IKO product lines the failure pattern applies to, and what the replacement actually costs in Summerlin.

Most Summerlin owners find us after a slow leak stains the ceiling below, a tile lifts near the drain, or a contractor’s previous work starts showing its seams. IKO sits in the same category as the other premium-specification brands we install, which means the parts are documented, matched to a model, and traceable back to a manufacturer spec sheet.
Which IKO Models This Applies To

IKO is a brand most homeowners know from roofing and waterproofing, and that’s where the specification work happens in a bathroom: underlayment membranes, waterproofing layers, and the material that sits beneath tile in a wet area. The IKO product lines that come into play in a Summerlin bathroom remodel are the waterproofing and underlayment systems, not fixtures. If you have a torn label or a scrap of packaging, the model line is usually printed on the edge of the roll or the back of the panel. If it isn’t, we measure the membrane thickness and the substrate it was laid over; that’s enough to match the specification.
Here’s the compatibility gotcha worth knowing before you buy anything: IKO waterproofing systems are specified as a system, meaning the membrane, the primer, and the seaming method are matched. A third-party membrane bonded with an IKO primer, or the reverse, can void both warranties even when each part looks correct on its own. On the OEM-versus-aftermarket question, aftermarket equivalents exist and some are genuinely fine, but only when the spec matches the IKO system exactly. If a supplier can’t show you the spec sheet, that’s your answer.
For the finished surfaces, we work from a documented roster of name-brand materials: KraftMaid, Cambria, and Silestone among them, so every specification stays traceable from drawing to close.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Bathroom Remodeling Is Failing
- Water staining on the ceiling below. That means the waterproofing layer has failed at a seam or a penetration, and water is reaching the substrate. In Summerlin’s dry climate, a slow leak can hide for months because the surface tile dries before anyone notices.
- Loose or hollow-sounding tile near the drain or the shower curb. Adhesive has released from the substrate, usually because moisture got behind the tile. Tap the area with a screwdriver handle; a hollow tone means the bond is gone.
- Grout that crumbles and regrouts within a season. Fresh grout failing quickly points to movement or moisture underneath, not to the grout itself. Regrouting over a wet substrate just delays the failure.
- A musty smell that returns after cleaning. Odor that keeps coming back usually means moisture is trapped in the wall cavity. The visible surface looks fine; the problem is behind it.
- Efflorescence, the white chalky powder on grout or tile edges. That’s mineral salt pushed out by water moving through the assembly. It’s one of the clearest signs the waterproofing layer is no longer doing its job.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

In Summerlin, a full bathroom remodel with IKO-specification waterproofing runs $9,000 to $28,000. A smaller bathroom, roughly under 40 square feet, lands at $5,000 to $12,000. If the scope is a walk-in shower, that’s $4,500 to $12,000; a tub-to-shower conversion is $3,500 to $10,000; a shower replacement alone is $3,000 to $8,500. A vanity installation adds $800 to $3,000.
What drives the range: square footage, how much substrate has to be removed and replaced, whether the rough-in plumbing needs to move, and tile selection. Parts and labor are itemized separately on the written quote, so you see the membrane and underlayment line, the labor line, and the fixture lines. Nothing moves once work starts; the written price is the price. Every completed project carries the 365-Day Done Right Promise, a full-year written guarantee. If the work fails inside that window, we come back and correct it at no charge.
DIY or Call Us?
An owner can safely check a few things: look for water staining from below, tap tile for hollow spots, and photograph any visible membrane or label before it’s covered. What you should not do yourself is tear into a wet-area assembly to “see what’s underneath.” Once the waterproofing layer is breached, the failure accelerates and a repairable situation becomes a full rebuild. Pulling tile and substrate in a shower or tub surround is not a homeowner task, and it’s where most DIY bathroom projects in Summerlin go wrong.
If you’ve already had a previous contractor’s work fail, the honest answer is that the assembly needs to be inspected, not patched. Call (844) 588-0072 and we’ll walk through what you’re seeing and what a correct repair looks like. Estimates are free, and a live person answers the phone.
FAQs

How long does IKO waterproofing last in a Summerlin bathroom? A correctly installed IKO system should last the life of the tile installation, typically 15 to 25 years with proper ventilation. Summerlin’s low humidity helps, but it also hides slow leaks, so annual visual checks under the bathroom and at the ceiling below are worth the five minutes.
Can it be repaired instead of fully replaced? Sometimes. A localized failure at a single seam or penetration can be repaired if the surrounding membrane is intact and the substrate is dry. If moisture has spread into the substrate, a partial repair usually fails again within a year, and a full replacement is the better use of the money. Call (844) 588-0072 for an exact assessment; estimates are free.
How long does the swap take? A shower or tub surround replacement with new waterproofing is typically 3 to 5 working days, including cure time. A full bathroom remodel in Summerlin runs 2 to 4 weeks depending on tile and fixture lead times. You get the schedule in writing before work starts.
How do you source the part? We match the IKO product line from the label or, failing that, by measuring the membrane and substrate, then source through suppliers who provide the manufacturer spec sheet and warranty documentation. Bradford Remodeling Co Summerlin is an independent service provider and is not affiliated with IKO; we install to IKO’s published specification, and we’re happy to show you the spec sheet for anything we put in your home.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.












