







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Delta Home Additions & ADU: The Summerlin Owner’s Guide
Home additions and ADUs in Summerlin typically run $45,000 – $130,000 for an addition and $90,000 – $220,000 for a detached or attached accessory dwelling unit, depending on size, foundation work, and how much of the existing structure has to change. These are planned builds, not emergency repairs, so we schedule them like a project. Nobody builds an addition in a day, and any contractor who tells you otherwise is guessing at your money. Owners usually come to us after the plan they started with stalled: a foundation detail that failed inspection, a roofline that never matched, or a builder who stopped picking up the phone mid-framing. That is where the real conversation starts.

Which Delta Models This Applies To

Delta builds additions and ADU systems to a specification, not a part number you can look up on a shelf. If you have a Delta plan set or a Delta-manufactured modular component, the model designation is usually stamped on the plan title block, on a data plate inside the unit, or on the wall panel tag. Write that number down before you call anyone. It is what we use to confirm how the unit was engineered and which structural and envelope systems it was specified to accept.
The OEM-versus-aftermarket question matters here. A Delta-spec’d structural connector, window unit, or panel assembly sold as a “compatible” aftermarket part is only compatible if it meets the same load rating and the same dimensional callout. On a Clark County addition, a connector or anchoring system that is undersized for the engineered load will fail inspection and, worse, will not protect the home in a wind event. We confirm the specification before we order anything. We do not stock Delta parts and we do not carry parts on a truck, so every component is sourced against the actual plan set, not pulled off a shelf.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Delta Home Additions & ADU Is Failing
- Foundation or slab movement. Hairline cracks that widen over a season, or a door that no longer closes clean in its frame. In Summerlin’s expansive clay soils, moisture swings move a slab, and an addition tied to a settled foundation telegraphs that movement through the whole structure.
- Roof-to-wall separation or daylight at the seam. Where the new roofline meets the existing house, a failing flashing or connector shows as a visible gap, a stain on the ceiling below, or daylight at the transition. This is an envelope failure, and in a desert monsoon season it lets water in fast.
- Stucco and envelope cracking at the joints. Vertical cracks along the addition’s exterior wall, especially near corners and penetrations, mean differential movement between old and new construction. Southern Nevada’s swing from 100-degree afternoons to cold desert nights works on those joints every day.
- Windows and doors out of square. A sliding door that drags, a window that will not latch, or a gap at the top of a jamb. That is the frame telling you the structure around it is moving, not the hardware.
- ADU panel or utility capacity shortfall. Breakers that trip when the ADU runs its AC and water heater together point to an electrical service that was never upgraded for the added load. That is a serious safety item, and it needs a licensed electrician before anything else happens.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Pricing for the work in Summerlin breaks down like this:
| Project | Typical Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What drives the range is foundation and site work, whether the electrical service has to be upgraded, roof and envelope tie-in, and the finish level you choose. A garage conversion sits at the low end because the shell already exists. A full ADU sits at the high end because it is a small house: its own utility runs, its own envelope, its own panel. Every price we give is written line by line before any work starts, parts and labor itemized, and it does not move at the door. All completed work is covered by the 365-Day Done Right Promise: if something fails within that year, we come back and correct it at no charge.
DIY or Call Us?
An owner can safely handle the paperwork: checking the data plate, keeping the plan set together, walking the perimeter each season looking for new cracks, and confirming a permit was pulled. That is the responsible part of the job.
What we will not tell you to do yourself is work that can put you or your family in danger. Electrical service upgrades and panel work carry real risk of shock and fire, and a structure tied to an undersized foundation is a safety matter, not a weekend project. Those go to a licensed tradesperson, plainly and without hedging.
If you are in Summerlin and something has stopped working or never worked right, give us a call. Bradford Remodeling Co Summerlin is an independent contractor, not affiliated with Delta, and we answer the phone with a real person 24/7.
FAQs

How long should a Delta addition or ADU last in Summerlin?
A properly built addition in the Las Vegas Valley should hold for decades, but the desert works on it. The parts that fail first are envelope seals, connectors, and anything tied to a moving slab. Lifespan comes down to the envelope detail and seasonal maintenance, not the brand name on the plan.
Can the failing part be repaired instead of replaced?
Sometimes, yes. A flashing or window detail can often be corrected without touching structure. A settling foundation or an undersized connector cannot be patched and called done; the fix is structural. We tell you which one you have after we look at it. Call (844) 588-0072 for an estimate.
How long does the work take?
A garage conversion runs weeks; a full ADU runs months, from permit to final inspection. There is no same-day answer for a build like this, and anyone offering one is not being straight with you. Call for a written scope and a real timeline.
How do you source the part?
We source against your actual Delta plan set and the engineered callout, then confirm specification and dimensions before ordering. No guesswork, no aftermarket part that only looks right. Call (844) 588-0072 to schedule a free estimate.
Bradford also installs KraftMaid, Cambria, and Silestone on the finish side of a project, so an addition or ADU can carry the same materials and warranties as the rest of the house.
Ready to price it properly? Call (844) 588-0072 for a free estimate. We put the price in writing before any work starts, and our technicians have up to 22 years of experience on the job.
Written by the team at Bradford Remodeling Co Summerlin, serving Summerlin and nearby areas.












